Thermal Shock Test Chamber (3 Zone)

Thermal Shock Test Chamber (3 Zone)

- Divided into a high-temperature zone, low-temperature zone, and test zone. The test product is placed in the test zone, and the temperature from the high-temperature zone or low-temperature zone is applied to the test zone for thermal shock. The test product remains static during the test.
- Equiped with a touch-screen control interface for easy operation.
- Temperature is transferred to the test zone using a wind route switching method to perform thermal shock testing.
- The maximum duration of high-temperature or low-temperature shock can reach 999 hours, and the maximum cycle period can reach 9999 cycles.
- The system can operate in automatic cycle mode or manually select specific shocks. It can be set to perform two-zone or three-zone shocks, as well as cold-to-hot or hot-to-cold transitions.
- The cooling system utilizes a dual refrigeration system, providing fast cooling. Water cooling is employed as the cooling method.
- Testing can be performed at room temperature.

Get Help